Volume 15, Issue 2 (1-1997)                   1997, 15(2): 27-42 | Back to browse issues page

XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

R. Hooshmand, H. Seifi, and V. Tahani. Application of Fuzzy Linear Programming in Optimal Load Shedding and Generation Reallocation Problem. Journal of Advanced Materials in Engineering (Esteghlal) 1997; 15 (2) :27-42
URL: http://jame.iut.ac.ir/article-1-93-en.html
Abstract:   (6629 Views)
In this article, an effective method to control a power system during emergency conditions is presented. Based on Fuzzy Linear Programming (FLP), a new technique is developed to solve the Load Shedding and Generation Reallocation (LSGR) optimization Problem. The objective function consists of terms of load curtailments and deviations in generation schedules. The constraints are power system variables limitations. The objective function and constraints coefficients are uncertain, thus it is more appropriate to use fuzzy linear programming. Considering the network frequency as an essential variable, and using the electrical load model, a fuzzy environment is prepared to solve more realistically and successfully the LSGR optimization problem. The results of various cases of fuzzy and crisp modes of the problem are demonstrated. It will be observed that the application of the FLP on one hand, will provide a more realistic model of power systems, and on the other hand, will cause a reduction in the values of the objective function.
Keywords: -
Full-Text [PDF 887 kb]   (1908 Downloads)    
Type of Study: Research | Subject: General
Received: 2014/10/25 | Published: 1997/01/15

Add your comments about this article : Your username or Email:
CAPTCHA

© 2024 CC BY-NC 4.0 | Journal of Advanced Materials in Engineering (Esteghlal)

Designed & Developed by : Yektaweb