Search published articles


Showing 9 results for Rabbani

S. M. T. Fatemi Ghomi, M. Rabbani,
Volume 18, Issue 1 (4-1999)
Abstract

Considering the network structure is one of the new approaches in studying stochastic PERT networks (SPN). In this paper, planar networks are studied as a special class of networks. Two structural reducible mechanisms titled arc contraction and deletion are developed to convert any planar network to a series-parallel network structure. In series-parallel SPN, the completion time distribution function can be calculated only by means of multiplication and convolution operations. For the first time, series-parallel networks are studied on the basis of the structural viewpoint. These networks belong to planar networks class. A key theorem provides capability of application of these mechanisms for non series-parallel planar networks
M. Rabbani,
Volume 21, Issue 1 (7-2002)
Abstract

In most stochastic inventory models, such as continuous review models and periodic review models, it has been assumed that the stockout period during a cycle is small enough to be neglected so that the average number of cycles per year can be approximated as D/Q, where D is the average annual demand and Q is the order quantity. This assumption makes the problem more tactable, but it should not be adopted when the beck order and lost sales penalty costs are relatively small. In this paper, considering a continuous review inventory model, we relax the above assumption and we explicitly take into account the stockout period when computing the expected cycle length. Further, we consider the effect of using exact number of cycles rather than using approximate of cycles in a continuous review inventory model. Keywords: Inventory control, Stochastic demand, Continuous review, Inventory cycle
M. Rabbani, K. Rezaie, M. M. Lotfi and M. Abadi,
Volume 23, Issue 1 (7-2004)
Abstract

In this paper, a new method for developing a lower bound on exact completion time distribution function of stochastic PERT networks is provided that is based on simplifying the structure of this type of network. The designed mechanism simplifies network structure by arc duplication so that network distribution function can be calculated only with convolution and multiplication. The selection of duplicable arcs in this method differs from that of Dodin’s so that it must be considered a different method. In this method, best duplicable arcs are adopted using a new mechanism. It is proved that duplicating numbers is minimized by this method. The distribution function of this method is a lower bound on exact network distribution function and an upper bound on distribution function of Dodin’s and Kleindorfer’s methods. After the algorithm for the method is presented, its efficiency is discussed and illustration examples will be used to Compare numerical results from this method with those from exact network distribution and Dodin’s method.
Rabbani, K. Rezaie and N. Seid Foroush Lahiji,
Volume 24, Issue 1 (7-2005)
Abstract

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is on the base of the minimum cost slope of activities. But since projects are usually performed over long periods, they can be affected by interest rate. In this paper, a new heuristic algorithm is presented in order to obtain the best combination of activity duration decrease while the monetary value is taken into account, with the goal of minimizing the sum of present value of project costs
R. Tavakkoli-Moghaddam, M. Rabbani, and M.a. Beheshti,
Volume 27, Issue 1 (7-2008)
Abstract

This paper presents a nonlinear mixed-integer programming model to minimize the stoppage cost of mixed-model assembly lines. Nowadays, most manufacturing firms employ this type of line due to the increasing varieties of products in their attempts to quickly respond to diversified customer demands. Advancement of new technologies, competitiveness, diversification of products, and large customer demand have encouraged practitioners to use different methods of improving production lines. Minimizing line stoppage is regarded as a main factor in determining the sequence of processing products. Line stoppage results in idleness of operators and machines, reduced throughput, increased overhead costs, and decreased overall productivity. Due to the complexity of the model proposed, which belongs to a class of NP-hard problems, a meta-heuristic method based on a genetic algorithm (GA) is proposed to obtain near-optimal solutions in reasonable time, especially for large-scale problems. To show the efficiency of the proposed GA, the computational results are compared with those obtained by the Lingo software.
M. Rabbani, R. Tavakkoli-Moghaddam, and H. Vahdan,
Volume 27, Issue 2 (1-2009)
Abstract

This paper presents a discounted cash-flow approach to an inventory model for deteriorating items with the two-parameter Weibull distribution. According to our proposed model, two shortages are considered: back-orders and lost-sales, in which the back-order rate is a varying function of the time when the shortage happens. In general, the demand rate is a linear function of the selling price. The objective of this model is to determine the optimal pricing policy and the optimal throughput time in such a way that the total net present value of profits is maximized in the given planning horizon. Finally, a numerical example is provided to solve the model presented using our proposed three-stage approach.
M. Rabbani, F. Taghiniam, H. Farrokhi-Asl , H. Rafiei ,
Volume 35, Issue 2 (2-2017)
Abstract

In this paper, the solution of a non-linear model of Cell Manufacturing (CM) in certain and dynamic conditions is
studied, considering intracellular and extracellular costs, cell constructing costs, the cost of restoration and the cost of equipment
transportation per distance travelled. Since the number of cells in each stage of production is important, by optimizing the
number of cells, additional costs can be minimized. Therefore, the main objective of this study is to investigate the optimal
number of cells located. Bio-geographical Based Optimization (BBO) algorithm is applied in the CM for the first time in the
literature and the obtained results from this algorithm are compared with the results of well-known genetic algorithm. The results
shows the good performance of genetic algorithm. Finally, the conclusion and future research are provided.


M. Rabbani, M. H. Afrazeh, S. Amini, H. Farrokhi-Asl,
Volume 36, Issue 2 (3-2018)
Abstract

Integrating the concepts of maintenance and production planning strategies is one of the most recent and important  issues for the reason of their effects on the final product price. This paper considers different situations for production lines, separately and independently, in ordinary time and overtime, assuming possibility of outsourcing. This paper aims to find an optimal maintenance strategy and to integrate maintenance strategy with production planning in batch production environment in order to reduce backorder sales and decrease the production and maintenance cost in the specified planning horizon.  Therefore, a new mathematical formulation is proposed for this problem. The proposed mathematical model is solved with two metaheuristic algorithms, namely simulated annealing and harmony search algorithms, and the obtained results are compared with each other. Regarding numerical results, two applied algorithms show acceptable results and the performance of the algorithms are almost identical.

M. Rabbani, E. Asgaari, A. Ghavamifar, H. Farrokhi-Asl,
Volume 37, Issue 2 (3-2019)
Abstract

In the recent decades, raw materials and resources have been remarkable issues for researchers; in other words, they play an important role in manufacturing industries or service organizations. On the other hand, the population is increasing every day. An increase in the population means the increased demand for goods or services. Therefore, more resources are needed to deliver services or goods. For this reason, government agencies and environmental agencies have developed and enforced stringent laws against producers and service providers who have exceeded the permissible limits for the environment; in some cases, the use of resources has been even restricted. In the meantime, the supply chain has become one of the major issues that can greatly influence this issue. In this research, the supply chain of the closed loop has been modeled due to uncertainty, disturbances and cost of production. The purpose of this problem has been to minimize the cost of the system in question based on the location decisions, and flow rates between levels and sales. The Lagrangian liberation solution method is used to solve this NP-hard problem. In the end, a numerical example has been employed to test the model and the proposed solution method. The results show that the time of implementation of the large-scale problem with GAMS is higher than that of the proposed method.



Page 1 from 1     

© 2024 CC BY-NC 4.0 | Computational Methods in Engineering

Designed & Developed by : Yektaweb