Search published articles


Showing 2 results for Analytical Solution

A. Arab, K. Esmaili,
Volume 25, Issue 1 (5-2021)
Abstract

The study of floods has always been important for researchers due to the great loss of life and property. Investigation of flood bed can provide appropriate solutions to reduce this phenomenon to managers and researchers. In this research, the compound channel (with flood plain on one side of the main channel) Been paid, Therefore, two experimental models of compound channel in laboratory flume were examined by considering dimensional analysis. With the goal Investigation of lateral slope of flood wall in laboratory model In the first model, transverse slope 0 And in the second model, a value equal to 50% Was considered. Also in order to investigate the effect of longitudinal slope of river bed sediments Longitudinal slope in three steps 0.00 2, 0.004 and 0.006 Was changed. Examining the ADV speedometer data, the results showed that with increasing the longitudinal and transverse slope (slope of the flood wall) of the channel, the maximum longitudinal velocity changes to the floor of the channel. In order to investigate the effect of average sediment diameter on the scouring process during experiments Mm was used. The results showed that increasing the longitudinal and transverse slope had a great effect on increasing the volume of washed sediments 3 and 0.9 of sandy sediments with a diameter Along the canal and with the increase of these longitudinal and transverse slopes in the channel, more sediment transport volume occurs. In the following, using Investigation of dimensionless numbers obtained from dimensional analysis, dimensionless weight landing number was introduced to evaluate this value value of other hydraulic parameters and Was introduced. A relationship based on nonlinear regression with correlation coefficient Acceptable was introduced at around 0.88.

H. Kazemizadeh, M. Saneie, H. Haji Kandi,
Volume 25, Issue 2 (9-2021)
Abstract

To prevent demolishing bridge piles due to developing the scour hole under the foundation of these piles some solution has been proposed in the literature. One of the important approaches could be installing different geometric of roughness at the downstream and upstream piles sections. This causes the downward flows which are performing the main role in developing scour holes to be marginally decreased. The present study explores the effect of geometric roughness and also, continuity and un-continuity of roughness length on maximum scour holes around bridge pile. Results indicate that due to increasing the length of roughness the developed scour holes were formed by less scour hole depths. Furthermore, continuity of roughness increases the scour hole depths; however, un-continuity causes the height of scour holes to be developed by fewer values. Also, the comparison shows that the length of installed roughness in maximum value is decreasing the scour hole depth constitute 34 percent. Based on the non-linear regression technique an equation has been proposed to predict the maximum scour hole due to different conditions. Comparison between experimental and proposed values shows that the accuracy of the proposed equation has an acceptable error which has been calculated less than 11 percent.


Page 1 from 1     

© 2024 CC BY-NC 4.0 | JWSS - Isfahan University of Technology

Designed & Developed by : Yektaweb