Volume 27, Issue 4 (Winter 2023)                   jwss 2023, 27(4): 299-324 | Back to browse issues page


XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Dabiri R, Abghari H, Ghorbani A. Locating of Watershed Management Operations with MCDM Approach and AHP and ANP Methods (Case Study: Saqezchi-Chay Watershed in Ardabil Province). jwss 2023; 27 (4) :299-324
URL: http://jstnar.iut.ac.ir/article-1-4354-en.html
University of Urmia , Dabiri.watershed@yahoo.com
Abstract:   (468 Views)
Management of watersheds and sustainable development today requires the most suitable and fastest method of obtaining and integrating information for optimal management and planning. One of the challenges of watershed management in the stage of planning and implementation of remedial and rehabilitation operations is choosing the appropriate and correct location; to have the necessary maximum efficiency and effectiveness, due to the high cost of mechanical operations and the lack of financial resources, select the right place to construct mechanical corrective dams has particular importance. Therefore, the objective of this research was to locate mechanical watershed management operations with a multi-criteria approach using AHP and ANP decision methods and compare the two methods in the geographic information system environment at the Saqezchi-Chay watershed. The research criteria and sub-criteria of 14 variables included soil (depth and texture), climate (type and precipitation amount), land use and Normalized Difference Vegetation Index (NDVI), hydrological factors and soil protection (flow accumulation, sedimentation rate, and curve number), topography (elevation and slope) and economic and social (distance from the village, from loan sources and the road). Expert judgments for weighting were collected through a questionnaire and in a field method with a statistical population of 29 experts and university professors. The results of this research showed that the ANP method had a significant correlation with the AHP method at the level of 95% and with an intensity of 0.839 and by comparing the prioritization of the two methods with Masonry Check Dams structures implemented in the Saqezchi-Chay watershed, it was determined that the ANP method prioritizes with more accuracy and resolution due to its network nature and increasing the range of changes.
Full-Text [PDF 2685 kb]   (151 Downloads)    
Type of Study: Research | Subject: Ggeneral
Received: 2023/05/21 | Accepted: 2023/11/7 | Published: 2023/12/31

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | JWSS - Isfahan University of Technology

Designed & Developed by : Yektaweb